by admctgroup | Nov 7, 2022
Wind Farm, Vestas Our teams supervised the detailed engineering, executed by a third party, of the Ventus Wind Farm, located in El Salvador. Several CT teams specialising in the different fields required in the wind farm and the feed-in substation participated in the...
by admctgroup | Nov 7, 2022
Red Eléctrica Española For two decades, our specialists have been working with different companies on the execution of comprehensive protection and control engineering, as well as electromechanical assembly for the end customer Red Eléctrica de España (REE). During...
by admctgroup | Nov 7, 2022
The International Thermonuclear Experimental Reactor (ITER), one of the most ambitious energy projects in the world today, placed at Cadarache in south-eastern France, is a globe-spanning collaboration of 35 nations (the ITER Members are China, the European Union,...
by admctgroup | Nov 7, 2022
Hydroelectric plant, Villarino Our team participated in the rehabilitation process that Iberdrola carried out for the first time for two of the three low-pressure valves of the Villarino de los Aires hydroelectric plant (Salamanca), an installation on the Tormes...
by admctgroup | Oct 13, 2022
g3 gas-insulated substation at Denmark’s Cerius (Photo: Business Wire) GAS-INSULATED SUBSTATIONS Our team has prepared the detailed engineering for the protection and control for substations with General Electric’s Gas Insulated Switchgear (GIS). We have extensive...